Skip to main content

Robot type · Gist Point

Mobile robots: AGV and AMR

Driverless vehicles that move pallets, carts and boxes around the plant all shift.

Ideal for: Supplying lines, removing finished goods and connecting the warehouse with production.

Autonomous mobile robot for moving materials
Follows fixed routes
AGV
Chooses its route and avoids
AMR
Carts, boxes and shelves
Pallets
Charges its own battery
Auto

What sets it apart

Why choose this robot

An AGV follows a fixed route (tape, magnets, reflectors or QR); an AMR builds a map with lasers and cameras, chooses the route and avoids obstacles. The decision is not about brand: it depends on the route, load, people, layout changes and integration with WMS, ERP or PLC. The cell is validated with a plant walk-through and, when needed, a measured pilot.

Driverless

Makes the same trips every day without depending on a forklift driver.

Navigation

The AGV follows a marked route; the AMR builds a map and avoids obstacles.

Safe among people

Laser scanners that slow or reroute the vehicle when someone crosses.

Integrates

Receives orders from the line, the PLC or the management system.

What it is used for

Typical applications

  • Bringing raw material from the warehouse to the line
  • Removing finished pallets from the end of the line
  • Moving carts and shelves between stations
  • Supplying robotic cells without intervention
  • Coordinating a fleet with the plant system

Clear expectations

What it can and cannot do

Guide: AGV vs AMR: how to choose for your plant

It can

  • Bring raw material to the line as it is needed.
  • Remove pallets from the end of the line and take them to the warehouse.
  • Charge its battery on its own between trips.

It cannot

  • Drive on broken floors, uneven ground or ramps out of spec.
  • Work well in blocked aisles or with a constantly changing layout without reconfiguration.
  • Replace a conveyor when the flow is continuous and very high.

Comparison

AGV vs AMR: what changes in practice

The central difference is navigation. From there, infrastructure, flexibility and installation cost change.

CriterionAGVAMR
NavigationFixed route: tape, magnet, reflector or QRMap + SLAM; chooses route and avoids obstacles
InfrastructureGuidance installed on the floor or environmentUpdated map, sensors and charging points
FlexibilityMedium: changing the route requires worksHigh: destinations and routes are added in software
SafetyISO 3691-4 + risk assessmentISO 3691-4 + risk assessment
LoadPallets, carts, shelves and tuggerPallets, carts, shelves and mobile arm
AisleMay require more space and guidanceUsually adapts better to existing aisles
Main costVehicle + guidance + site worksVehicle + software + sensors
Best forStable route and high volumePeople, layout changes and several destinations

In detail

What defines the cell

Vehicle types

The load and delivery point define the vehicle. Moving a pallet is not the same as lifting a cart or bringing a shelf to a picking station.

  • Underride: slides under the cart or shelf and lifts it.
  • Autonomous pallet jack: picks the pallet from the floor.
  • Driverless forklift: high load and storage.
  • Shelf, tugger or base with a robotic arm.

How to assess the route

The route is walked with the plant team before quoting. Floor and traffic details define speed, safety and vehicle type.

  • Floors, joints, ramps and slopes.
  • Aisle width, doors and turns.
  • People, forklifts and other vehicles.
  • Charging points, WiFi and waiting zones.

Safety and standard

Risk assessment rules. ISO 3691-4 is the usual reference for driverless industrial vehicles: scanners, speed zones, braking, crossings and load stability must be reviewed.

  • Scanners and obstacle detection.
  • Speed zones and pedestrian crossings.
  • Braking, load and behavior on faults.
  • Installation risk assessment.

Fleet, software and plant

A single vehicle does not solve intralogistics. A system is needed to receive missions, prioritize, manage charging and communicate with WMS, ERP or PLC.

  • WMS, ERP and PLC: who creates the mission and how it is prioritized.
  • Traffic manager, missions and blockages.
  • Battery charging and fleet availability.
  • KPIs: trips, waiting, availability and damage.

Total cost and ROI

Cost is not just the vehicle: it includes navigation, batteries, chargers, load structure, safety, fleet software, integration, site works, commissioning, training, spare parts and support. Payback is calculated with operation data, not a generic percentage.

  • Measure current trips, loading times and waiting.
  • Include labor, damage and forklift hours.
  • Separate external benchmarks from first-party data.
  • Validate with a pilot before scaling the fleet.

To assess

What we need to assess your route

Send my case
  1. 01Layout with routes and destinations.
  2. 02Photos of floors, aisles, doors and ramps.
  3. 03Load weights and types.
  4. 04Trip frequency per shift.
  5. 05Number of people and vehicles in the area.
  6. 06Systems to integrate and pilot success criteria.

Real equipment

Examples we integrate

What makes a robot industrial
AMR that lifts carts
AMR that lifts cartsSlides under the cart or shelf, lifts it and takes it to its destination.Manufacturer: VisionNav
Shelf-moving robot
Shelf-moving robotBrings the shelf to the picking station: the operator stops walking.Manufacturer: Geek+
Industrial delivery robot
Industrial delivery robotMoves boxes and parts between workstations, up to 300 kg per trip.Manufacturer: Pudu

Photos from manufacturers we work with. Model, configuration and availability are defined in each project. The vehicle type, load and navigation are defined with a walk-through of the plant: floors, aisles, doors, ramps and foot traffic.

FAQ

Frequently asked questions

What is the main difference between an AGV and an AMR?

An AGV follows a fixed route and an AMR builds a map, chooses the route and avoids obstacles. That changes infrastructure, flexibility and fleet management.

How do I know whether I need an AGV or an AMR?

It is defined by route, volume, people, layout changes and integration. If the route is stable and the environment orderly, an AGV may be enough; with variability, an AMR usually adapts better.

What must be prepared in the plant?

Floors, aisles, doors, ramps, charging zones, WiFi, signage and a safety assessment. The route is validated before quoting.

Which safety standard applies?

ISO 3691-4 is the usual reference for driverless industrial vehicles. The installation's risk assessment defines the specific measures.

Can it integrate with WMS, ERP or PLC?

Yes, but integration must be defined in scope: who creates the mission, how it is prioritized, which signals are exchanged and what happens on a fault.

How is total cost calculated?

Vehicle, navigation, batteries and chargers, load structure, safety, fleet software, integration, site works, commissioning, training, spare parts and support. Comparing only the vehicle price is not enough.

Is it worth starting with a pilot?

Yes, when route and volume have not been measured yet. A scoped pilot validates navigation, safety, load and times before scaling the fleet.

Do you support Argentina and neighboring countries?

Yes. Assessment and integration are coordinated from Córdoba for Argentina, Chile, Peru, Bolivia, Paraguay and Uruguay.

Guides

Guides on mobile robots: agv and amr

View all guides

Other robot types

Next step · Gist Point

Is this the robot for your process?

Tell us what you want to solve and we will tell you which equipment fits and how it integrates with your plant.